Generation that matches your uptime target
Data center teams contact us for several different jobs: standby generators that must start every time, bridge power until the utility arrives, or gas turbines that carry the campus. USP&E designs and builds all three, and can run them afterwards.
Equipment ready to ship is listed in the USP&E inventory.
Get in touch
Request a callback
Leave your details and an engineer will call you back about your facility.
Contact form ›What helps us scope your power
- Facility load today and at full build, in MW.
- Redundancy target, for example N+1.
- Fuel preference: diesel, gas or both.
- Site location and the state of the utility connection.
- The date generation must be ready.
Useful reading before you write
Our offices
USP&E works from six offices in the USA, the UK, South Africa and China, and is certified to ISO 9001 and ISO 45001.
Colorado Springs
1755 Telstar Dr, Suite 300, Colorado Springs, USA
Knoxville
800 S Gay St, Suite 700, Knoxville, USA
London
162-168 Regent Street, London, UK
Johannesburg
22 Kildoon Rd, Bryanston, South Africa
Cape Town
31 Brickfield Road, Woodstock, South Africa
China
No. 1 Ningzhou Road, Wuxi, China
Certified and accountable
A data center runs on trust in its power. USP&E keeps design, construction and operation on one team, backed by ISO 9001 and ISO 45001 systems.
Is your power plan keeping pace with your build?
Call +27 10 822 2324 or email info@uspeglobal.com with your load and your date.